Our services, in detail

Four engineering services, all under the responsible charge of a licensed Florida PE.

Program 01 · What is visible, stated as such

Structural assessment

Owners usually want a yes or no, and the honest answer is a report that distinguishes what was observed, what it indicates and what could not be seen. Concealed framing, undocumented past alterations and latent defects are limits of any visual assessment, and they belong in the report rather than being implied away.

  • Per property
  • Owners and buyers
  • Quoted in writing
  • Access to inspect

Start this program

Stage 1 · Information

Drawings, permits and history supplied.

Stage 2 · Site visit

Visible and accessible areas.

Stage 3 · Analysis

Observation against engineering judgement.

Stage 4 · Report

Including stated limitations.

Stage 1 · The change

What is being altered or added.

Stage 2 · Existing capacity

Established before designing.

Stage 3 · Calculations

Gravity and wind, documented.

Stage 4 · Design

Detailed so it can be built.

Program 02 · Loads actually run

Design & calculations

Removing a wall, adding a storey or hanging new equipment changes the load path, and in Florida wind loading governs more than people expect. Calculations are performed and documented, so the design can be defended to a plans examiner rather than asserted.

  • Per project
  • Owners and contractors
  • Quoted in writing
  • Existing drawings

Start this program

Program 03 · Signed, dated and sealed

Permit drawings

Permit drawings are prepared to what the local authority actually requires, which varies between jurisdictions more than most people expect. We respond to plan review comments as part of the work — a set that collects comments and is then abandoned helps nobody.

  • Per project
  • Owners and contractors
  • Quoted in writing
  • Approved scope

Start this program

Stage 1 · Jurisdiction

What this authority specifically requires.

Stage 2 · Drawings

Prepared to that standard.

Stage 3 · Sealed

After the engineer's own review.

Stage 4 · Comments

Answered through to approval.

Stage 1 · Scope

What is being inspected and why.

Stage 2 · Inspection

Where it is safe to access.

Stage 3 · Findings

Damage distinguished from pre-existing.

Stage 4 · Report

Factual, with limitations stated.

Program 04 · Before and after

Inspections & post-storm

After a storm, owners and insurers both need an independent engineering opinion on what is damage and what was already there. We assess and report factually. We do not adjust claims, we do not represent anyone in a dispute, and we will not characterise pre-existing conditions as storm damage.

  • Per inspection
  • Owners and insurers
  • Quoted in writing
  • Safe access

Start this program

Got a structural question?

A free first conversation, including an honest answer about whether you need an engineer.